Bug 14330 - Prognosesimulation: Ex post/Ex ante Zeitraum im Detailbild unklar
Summary: Prognosesimulation: Ex post/Ex ante Zeitraum im Detailbild unklar
Status: VERIFIED FIXED
Alias: None
Product: Forecast
Classification: SCX/Suite
Component: DCF Prognose (show other bugs)
Version: 22.0
Hardware: All All
: P5 normal
Assignee: Klaas, Martina
QA Contact: Lenz, Florian
URL:
Whiteboard:
Keywords: Scorpius, Vorabkorrektur
Depends on:
Blocks:
 
Reported: 2022-02-01 10:47 CET by Klaas, Martina
Modified: 2022-10-10 15:49 CEST (History)
5 users (show)

Kundennummer:
Bestellnummer:
PV Übergabe: ---
Phase Roadmap: ---
Erledigt mit: Scorpius
SAP Release: ECC 6.0 EHP7
Transport: M37K903822;M50K901660;M60K901856;M52K900859;M62K901017;M63K900290;M53K900244; M37K903829; M50K901713; M60K901919; M52K900947; M62K901138; M63K900441; M53K900366
CRM-ID/Ticket:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Klaas, Martina intern 2022-02-01 10:47:15 CET
Im Detailbild der Prognosesimulation (/GIB/DCF_PSIM) (= Testreihen zum einzelnen Prognoseverfahren) wird für alle Testreihen der ex post und ex ante Zeitraum der konsolidierten Reihe (999) farblich markiert - nicht die spezifischen Zeiträume der betreffenden Testreihen.
Comment 2 Klaas, Martina intern 2022-03-01 10:15:54 CET
Im Detail-Grid der einzelnen Testreihen (<> 999) werden zusätzlich die Perioden der IST-Spalte farblich markiert, wenn sie in die Erstellung der jeweiligen Prognose einbezogen wurden.
Comment 1 Klaas, Martina intern 2022-02-03 11:11:27 CET
Für die einzelnen Testläufe wird im Detailbild der Prognosesimulation nun zusätzlich zum ex post und ex ante Zeitraum der übernommene Periodenwert farblich markiert.